Project Description
Batch3 (Four Residential Buildings G+5)
The buildings are designed to meet different needs of costumers, as it includes more than one model of apartments with eight commercial shops.

About the Project
- Buildings (A, B,C &D).
- Components:
BLOCK A & BLOCK B
NOS OF SHOPS =8X2=16
- NOS OF FLAT =25X2=50
- CAR PARKING REQUIRED FOR BLOCK A & B =66 NOS
- BLOCK C & BLOCK D
- NOS OF SHOPS =8X2=16
- NOS OF FLAT =25X2=50
- CAR PARKING REQUIRED FOR BLOCK C & D =66 NOS
Total Built Up Area: 14,812 M2
- Status: Completed
Total Cost: R.O 3,099,500.00
- Starting Construction Date: April 2016
- Handing Over Date:
June 2018
During construction
After construction
Related Projects
- Telal ALQurum – Project’s Access Roadpixll2020-06-04T09:09:24+04:00
Telal ALQurum – Project’s Access Road
Contact us Today
If you’d like to talk to us about a project, or anything else, we’d love to hear from you.