Project Description
Al BUSTAN RESIDENCES– MUSCAT
RESIDENTIAL VILLAS (ON GOING PROJECT)
The project includes 44 villas located near Al Bustan Beach and the most outstanding landmarks of the city, such as the Council of Oman and the Al Bustan Palace Hotel.
The site is about 7 kilometres from Ruwi, and almost the same distance from the Muttrah Corniche and its heritage market, which considered as a favourable destination for tourists, visitors, citizens, and residents.
About the Project
Developer : Al Bustan Villas Company
Main Contractor: NCCW Company
Total built up area= 9,837.1 seq.m
Number of the Villas: 44 Nos.
Types of the Villas: 9 Models
Starting date: 20 April 2018
Estimated Finishing date: April 2020
Model’s Brief
Type A: No of Units = 16
Type B: No of Units = 10
Type B1: No of Units = 2
Type C: No of Units = 6
Type D: No of Units = 4
Type E: No of Units = 2
Type F: No of Units = 1
Type G: No of Units = 1
Type H: No of Units = 2

During construction
MOCK-UP Villa (B 14)
mock-up Villa is a residential villa, which is sufficiently spaced out, with beautifully landscaped gardens surround it. The Villa is designed over 3 floors and provide 2 Reception rooms with kitchen, 4 Bedrooms, 4 Bathrooms (two master bathrooms attached to master bedrooms, common bathroom and guest bathroom) and Maid’s room with bath facilities in additional to store in GF and laundry in PH. .
The villa is well designed and best utilize the building footprint, providing building area of ~ 229.05 m2, as well it is provided with a small private garden and parking for one vehicle.
It took six months to complete construction and the villa has been hand over on 12/01/2019, then the classy furniture was distributed throughout the villa, which was chosen from Abyat, Home Center and IKIA.
About the Project
This villa was constructed to be as a model home for Al Bustan residence Project to serve the following purposes:
1- All approved materials and designs are reflected in the mock up villa to be as a guide line while constructing stage for other villas.
2- To avoid any possible imperfection in the design during construction.
3- Marketing purposes, where the customers can have clear idea about the villas with its final stage.
After construction
Project Related External Works
Related Projects
- Telal ALQurum – Project’s Access Roadpixll2020-06-04T09:09:24+04:00
Telal ALQurum – Project’s Access Road
Contact us Today
If you’d like to talk to us about a project, or anything else, we’d love to hear from you.